Talk to us
Factory stacks releasing steam at dusk

Less clinker, more margin.

We prepare the clinker factor, alternative fuel and quarry reclamation data that PROPER, carbon regulators and buyers ask for, and bring it together on Ailesh+.

When the market is saturated, emissions intensity sets you apart.

Clinker factor, the alternative fuel share and kiln heat consumption get reused by PROPER, national emissions reporting and European importers. Record them once per kiln, properly, and compliance cost falls along with fuel cost.

Risk

National capacity far exceeds demand, and cement is among the first subsectors being prepared for mandatory emissions trading. For exporters, European importers have carried the cost of embedded emissions in clinker and cement since 2026.

about 56% projected national cement plant utilisation in 2026.

According to Kontan, 2026; Fortune Indonesia, 2025

Opportunity

Fly ash, slag and pozzolan that replace part of the clinker cut process emissions and cost together. Biomass and refuse-derived fuel (RDF) bring the coal bill down in the same kiln.

81% → 68.1% national clinker factor since 2010.

According to the Ministry of Industry via industry.co.id, 2026

Priority

Set a per-kiln baseline that separates calcination CO2 from fuel, secure the co-processing permit and reclaim the quarry from the first bench. That data fills PROPER, the annual emissions report and importer declarations at once.

  • EU CBAM

    definitive period since 1 Jan 2026; first declaration due 30 Sep 2027

    Without verified actual data, importers use default values with a 10% mark-up in 2026, rising to 30% from 2028.

    According to the European Commission; CBAM Guide, 2026

  • Cement emission standards (Environment and Forestry Ministry Regulation P.19/2017) and SISPEK (Regulation 13/2021)

    in force

    Kiln CEMS must report in real time to SISPEK, the national online emissions system, and hazardous-waste co-processing adds dioxin-furan and CO limits.

    According to peraturan.go.id; the BPK legal database

  • PROPER (Environment Ministry Regulation 7/2025)

    annual cycle

    Mine land damage control is part of the compliance rating, and Green and Gold ratings are verified on site.

    According to the BPK legal database

From karst reserve to restored quarry, one chain of data.

The limestone reserve chosen at the start sets the quarry's life, its reclamation duties and how much clinker can be replaced. Pick your phase to see what needs to be ready.

Phase 1: The quarry is chosen once; its karst duties last decades.

Limestone almost always sits in karst landscapes that hold springs, caves and endemic species. With national capacity far above demand, feasibility also has to answer where the cement will be sold.

What needs to be ready

    • 1.1 Karst, forest and spatial status

      Confirm the reserve lies outside protected karst landscapes and the state forest estate before applying for the mining licence area (WIUP) and spatial approval (KKPR).

      According to Energy Ministry Regulation 17/2012

    • 1.2 Karst baseline and community rights

      Survey caves, springs, endemic species and downstream water users, then run free, prior and informed consent (FPIC) where the reserve sits on customary land.

    • 1.3 Market and target intensity

      New plant applications are locked in the online licensing system (OSS) except in Papua and Maluku, so feasibility has to win on intensity and haulage cost.

      a national average of 566.3 kg CO2 per tonne of cement equivalent

      According to Fortune Indonesia, 2024; the Ministry of Industry via industry.co.id, 2026

Phase 2: One kiln drawing, three approvals that rely on it.

The integrated quarry-and-plant AMDAL, the kiln emissions approval and the hazardous-waste utilisation approval all cite the same drawings. The alternative fuel line and heat recovery designed now set energy cost for the life of the kiln.

What needs to be ready

    • 2.1 Integrated AMDAL and kiln CEMS

      One environmental impact assessment covers quarry to packing, with CEMS points for particulates, SO2, NOx and CO fixed in the technical study.

      the Environmental Approval is issued within 93 working days in a normal case

      According to Government Regulation 28/2025 and Regulation P.19/2017

    • 2.2 Co-processing and RDF suppliers

      Design receiving and feeding for a minimum calorific value of 2,500 kcal/kg, then set RDF supplier criteria on permits, odour, chlorine and child labour.

      According to Regulation P.19/2017 Annex V and Environment and Forestry Ministry Regulation 6/2021

    • 2.3 A reclamation plan from the mine design

      Prepare the five-year reclamation plan and its guarantee together with the biodiversity plan built on the karst baseline.

      According to Energy Ministry Regulation 26/2018

Phase 3: Dust and vibration on record from the first blast.

Quarry opening and preheater construction run side by side, and residents feel the dust, vibration and trucks before the first clinker comes out. Staged opening and tidy blast records keep the open area small and every complaint answered.

What needs to be ready

    • 3.1 Staged quarry opening

      Open benches to the annual plan, stockpile topsoil and build settling ponds before haulage starts.

    • 3.2 Vibration, noise and dust

      Monitor every blast at the nearest homes and report the results each semester through SIMPEL, the ministry's environmental reporting system.

      a residential noise limit of 55 dB(A)

      According to Environment Ministry Decrees 48/1996 and 49/1996

    • 3.3 Haulage, workers and grievances

      Set load limits and travel hours for construction trucks, record the local-hire share and answer every resident complaint.

Phase 4: The first kiln lights up and the baseline year begins.

The intensity that PROPER, the GCCA target and European importers compare against is the baseline recorded now, kiln by kiln. Operating certificates, validated kiln CEMS and per-unit energy meters make that figure verifiable.

What needs to be ready

    • 4.1 Operating certificate and kiln CEMS on SISPEK

      Apply for the operating certificate (SLO) after trial runs and send hourly CEMS data, because compliance is counted from 95% of daily data.

      According to Environment and Forestry Ministry Regulations 5/2021, 13/2021 and P.19/2017

    • 4.2 Alternative fuel trials

      Measure dioxins-furans, HCl, HF and heavy metals when the first RDF and hazardous waste are fed, because the results set the substitution rate you may run.

      a dioxin-furan limit of 0.1 ng TEQ/Nm³ during co-processing

      According to Regulation P.19/2017

    • 4.3 GHG inventory per kiln

      Separate calcination CO2 from fuel CO2 under the GCCA method, so one figure serves national reporting and importers. The inventory report is due by March every year.

      According to Presidential Regulation 110/2025 and Environment Ministry Regulation 7/2026

Phase 5: Every tonne of clinker replaced shows in rating and margin.

Clinker factor, alternative fuel share and kcal per kg of clinker are assessed by PROPER and verified for importers. Alternative fuel also protects margins when sales are slow.

12.58% vs 29% alternative fuel share, national average against one producer in 2025.

According to the Ministry of Industry via industry.co.id, 2026; Indocement, 2026

What needs to be ready

    • 5.1 From Green towards Gold

      Build evidence on LCA, energy and water efficiency, waste 3R, quarry biodiversity and SROI for village programmes.

      one cement plant reached Gold with evidence of 5,545 GJ saved

      According to Indocement, 2025

    • 5.2 Clinker factor and supplementary materials

      Replace part of the clinker with fly ash, slag, pozzolan or limestone in PCC and PPC, since coal ash (FABA) and slag are already excluded from hazardous waste.

      According to Government Regulation 22/2021 Annex XIV

    • 5.3 Embedded-emissions data for importers and PSPK

      Prepare verified actual embedded emissions per product, process CO2 included, before importers file their first declaration. For listed companies, PSPK 1 and 2, Indonesia's adoption of IFRS S1 and S2, phase in from 2027.

      According to the European Commission; IAI, 2025

Phase 6: Quarry restored, kiln upgraded, permit updated.

An exhausted quarry must reach full reclamation success before its licence area is returned, and the land can become farmland or a carbon project. At the plant, a kiln upgrade or clay calciner changes feedstock and capacity.

What needs to be ready

    • 6.1 Quarry reclamation success

      Monitor springs and cave species until they recover against the baseline, then apply for the reclamation and mine-closure success assessment.

      According to Government Regulation 96/2021 and Energy Ministry Regulation 26/2018

    • 6.2 The old quarry as a mitigation action

      Register agroforestry or revegetation in the national climate registry (SRN PPI) so it earns residents an income and generates carbon units.

      According to Presidential Regulation 110/2025

    • 6.3 Permit changes before a retrofit

      File the addendum before a kiln upgrade, clay calciner or added waste-heat recovery plant is built, because changing operations without amending the permit draws an administrative fine.

      According to Government Regulation 22/2021 Annex V and Environment Ministry Regulation 6/2026

Every unit adds a figure to your intensity per tonne.

Every unit carries its own obligations and data. Open them one by one, from quarry to port.

Limestone and clay quarry

Limestone is blasted from benches and clay is dug, then both are hauled to the crusher.

  • Biodiversity
  • Water
  • Community
  • Safety

What you can manage

  • Reclaim each bench once mining ends
  • Monitor karst springs and groundwater
  • Announce blasts and measure vibration at nearby homes

26 ha of quarry reclaimed with 88,646 trees at one major producer

Source: Indocement, 2026

Quarry villages and workforce

Dryland farming villages around the quarry and truck routes live with dust, vibration and traffic every day.

  • Community
  • Safety
  • Water

What you can manage

  • Sort complaints by dust, vibration, springs and trucks
  • Measure village programme results with SROI
  • Enforce confined-space permits in silos and the preheater

319,382 workplace accidents were recorded in Indonesia in 2025

Source: Manpower Ministry via GoodStats, 2026

Crusher, preblending and raw mill

Rock is crushed, blended with corrective materials, then ground and dried into raw meal with hot kiln gas.

  • Energy
  • Emissions
  • Safety

What you can manage

  • Cover stockpiles and fit dust collectors
  • Log kWh per tonne of raw meal
  • Record slag as an alternative raw material for LCA

Preheater, calciner and kiln

Raw meal is calcined, releasing process CO2 from limestone, then burned into clinker at about 1,450 °C.

  • Emissions
  • Energy
  • Safety

What you can manage

  • Connect kiln CEMS to SISPEK in real time
  • Separate calcination CO2 from fuel CO2
  • Track kcal per kg clinker as the main energy use

566.3 kg CO2 per tonne of cement equivalent, national average

Source: Ministry of Industry, 2026

Alternative fuels and co-processing

RDF, biomass and third-party hazardous waste are received, pre-treated and fed to the calciner or burner in place of coal.

  • Waste
  • Emissions
  • Safety
  • Community

What you can manage

  • Test calorific value and chlorine in every delivery
  • Accept hazardous waste only under electronic manifest
  • Audit RDF suppliers' permits and odour control

12.58% national alternative fuel share, up from 3%

Source: Ministry of Industry, 2026

Clinker cooler and heat recovery

Clinker is air-cooled, and waste heat from the preheater and cooler is turned into power by the recovery plant.

  • Energy
  • Emissions

What you can manage

  • Meter recovery-plant kWh separately for the energy audit
  • Install solar on warehouse roofs and plant land
  • Test cooler particulates every six months

6.5 MWp and about 72 MW of solar at the two largest producers

Source: SIG and Indocement, 2026

Cement mill and blended cement

Clinker is ground with gypsum and SCMs such as fly ash, slag, pozzolan or limestone into OPC, PCC or PPC.

  • Emissions
  • Energy
  • Waste

What you can manage

  • Set a clinker factor target for each product
  • Calculate LCA and EPDs for green building projects
  • Make sure products meet the mandatory cement SNI

A full shift to PCC and PPC cuts sector emissions by about 25%

Source: Global Cement, 2024

Packing, distribution and port

Cement is bagged or loaded in bulk, then sent by truck to distributors or by bulk carrier to other islands.

  • Emissions
  • Community
  • Safety

What you can manage

  • Weigh every outgoing truck and refuse overloads
  • Agree routes and travel hours with villages
  • Log tonne-km by mode for Scope 3

About 29,000 to 75,000 trucks: estimated cement fleet needed under Zero ODOL

Source: Cement association via Bisnis.com, 2025

Water, wastewater and retention ponds

Cooling water, domestic water and quarry runoff run through one system, with treatment and retention ponds downstream.

  • Water
  • Community

What you can manage

  • Monitor the outlet and downstream karst springs
  • Harvest rainwater to cut groundwater withdrawal
  • Build a quarry and plant water balance per tonne

297 litres per tonne of cement equivalent at one of the largest producers

Source: SIG and Indocement, 2026

1 / 9

Typical facility illustration; not a specific site.

One figure per tonne for PROPER, the registry and importers.

Kiln, alternative fuel, water and quarry data often sit with separate production, mining and sustainability teams, so the figure per tonne can differ from one report to the next. Ailesh+ brings it together: CEMS and meters via IoT, energy in Energy+, calcination and fuel CO2 in Carbon+, hazardous-waste manifests in Waste+ and quarry biodiversity in Biodiv+. PROPER+ and ESG+ then build your reports from the same figures.

Which phase are your quarry and plant in?

Tell us the phase, from assessing a karst reserve to preparing a co-processing permit. We'll map the figures and documents that need to be ready.