Phase 1: Map your suppliers before you draw the plant.
A food and beverage plant needs large volumes of food-grade water, and the farms supplying its palm oil or cocoa must be locatable on a map. Both are settled in this phase, along with the steam source and refrigerant.
What needs to be ready
1.1 Food-grade raw water
Map the source, drought risk and water-resource licence before you buy the land.
According to Public Works Ministry Regulation 2/2024
- Water audit
- Waste+
1.2 Origin map for high-risk ingredients
Collect supplier codes and farm coordinates for palm oil, cocoa and coffee before the first contract, against a deforestation-free reference date of 31 December 2020.
1.3 Steam and refrigerant source
Compare gas, biomass and wastewater biogas from the start, then choose low-GWP refrigerants in line with the Kigali Amendment.
According to Presidential Regulation 129/2022
- Decarbonisation strategy
- Energy+