Approval in hand, project on schedule.
We identify the documents you need, prepare them from field data and stay with you until your technical approvals and operating certificate (SLO) are issued.
The documents that set your plant's rules.
Before a plant is built, its environmental documents already decide how it may operate. Wastewater limits, monitoring points, hazardous waste storage and commitments to neighbours are written into them and bind you for years. We prepare your AMDAL (environmental impact assessment), UKL-UPL (environmental management and monitoring plan) and technical approvals so they are sound on paper and workable on site.
Permits that won't come back to bite you.
Right document, first time
Screening on the ministry's Amdalnet system now comes with every business identification number (NIB) application and decides which document you need. We run it first, including spatial-use and forest-area checks, so no document has to be redone.
According to KLH/BPLH, 2025
Construction that isn't held up
Wastewater and emissions may only be discharged once technical approvals are issued, and the installation may only run after its operating certificate (SLO). We prepare the technical studies alongside your environmental approval, so permits stay off the project's critical path.
According to Environment and Forestry Ministerial Regulation 5/2021
Ready when inspectors arrive
Inspectors check whether every obligation in your documents is actually happening on site. We compare the two first, so findings are fixed before they become sanctions.
55.64% of 270 companies in six Greater Jakarta industrial estates were found non-compliant at verification.
According to KLH/BPLH, 2025
Expansion without fines
Adding capacity, switching raw materials or extending your site without updating your environmental approval can now draw an administrative fine. We assess every planned change and prepare an addendum when one is needed.
Rp3 billion maximum administrative fine per violation.
According to KLH/BPLH Regulation 6/2026
From site plan to operating certificate.
- Redefine
Scope the permits you need
We screen your planned activity or change, check spatial-use conformity (KKPR) and forest-area status, then map the permits you need and the order to obtain them. For acquisitions, the same review becomes an environmental due diligence of permits and site conditions.
You receive: a document list, a filing sequence and estimated timelines.
- Redefine
Measure the baseline
Our field team measures air, water, soil, noise, biodiversity and social conditions around the site.
You receive: baseline data for your documents that can be reused for PROPER and sustainability reporting.
- Design
Prepare documents and technical studies
We prepare your AMDAL, UKL-UPL, simple environmental statement (SPPL) or addendum, run public consultation and, in parallel, prepare technical studies for wastewater, emissions and hazardous waste storage.
You receive: environmental documents and technical approval files ready to submit.
- Accelerate
See it through, keep it current
We support the review and revisions until approval is issued, then the installation trial and SLO application. Once you operate, we prepare your periodic environmental management and monitoring reports (RKL-RPL) and move your monitoring data onto Ailesh+.
You receive: responses to every reviewer comment, an SLO file and a calendar of post-approval obligations.
Periodic reports without the deadline scramble.
Once a permit is issued, waste manifests, waste balances and monitoring results often sit in scattered spreadsheets. Waste+ records waste from source to final handling, along with water data, and Ailesh+ IoT sensors stream field measurements straight to a dashboard. Your next RKL-RPL report is built from data already collected.
Tell us what you're planning.
We'll help you scope the right documents and the order to file them.