Palm oil you can prove, from plot to tank.

We prepare the data European buyers, PROPER and ISPO ask for at every phase of your estate, mill and refinery, and bring it together on Ailesh+.

European buyers, PROPER and ISPO now ask the same questions.

Plot geolocation, POME pond data and peat water-table records get reused by every obligation. Prepare them once, properly, and you save cost while protecting market access.

Risk

From 30 December 2026, palm products can only enter the EU if every plot of origin is proven deforestation-free since the end of 2020. At home, estates inside the state forest estate are being brought into line.

4.1 million ha of recovered forest-estate land is now run by state-owned Agrinas Palma.

According to the European Commission, 2026; Antara, 2026

Opportunity

Covering your POME ponds turns the mill's largest emission source into electricity. Most of that potential is still untapped.

650 → 70 kg CO2e per tonne of CPO with methane capture.

According to the RSPO, 2018

Priority

Map the geolocation of every plot, set the mill's emissions and water baseline, then build HCV and peat plans that can be audited. That data fills Due Diligence Statements, PROPER documents and ISPO audits at once.

  • EUDR

    applies 30 Dec 2026 for large and medium companies, 30 Jun 2027 for micro and small

    Deforestation-free since 31 Dec 2020 and geolocation for every plot. Certain palm derivatives follow from 30 Dec 2027.

    According to the European Commission, 2026; Rödl & Partner, 2026

  • Mandatory ISPO (Presidential Regulation 16/2025)

    in force since 19 Mar 2025

    Mandatory from estate to refinery and biodiesel plant.

    According to the BPK legal database

  • PROPER (Environment Ministry Regulation 7/2025)

    annual cycle

    Peat damage control is part of the compliance rating.

    According to the BPK legal database

From land evaluation to replanting, one chain of data.

The data buyers and regulators ask for starts forming the day the land is chosen. Pick your phase to see what needs to be ready.

Phase 1: Land status is settled before the first seedling.

Estates inside the state forest estate are now being brought into line, and plots cleared after 2020 are closed to the European market. Decisions made here cannot be fixed by certification later.

What needs to be ready

    • 1.1 Forest and peat status

      Confirm the planned estate sits outside the state forest estate and protected peat before you buy the land.

      According to Presidential Regulation 5/2025 and Government Regulation 57/2016

    • 1.2 Proof of no deforestation

      Check forest-cover imagery as at 31 December 2020 for nucleus, scheme and prospective supplier areas.

    • 1.3 Nature and social baseline

      Survey flora, fauna, rivers and community rights, then run FPIC before any land is cleared.

Phase 2: Today's design figures set decades of operating cost.

The AMDAL, technical approvals and land application licence all cite the same design figures. Getting them right once costs far less than fixing them while the mill runs.

What needs to be ready

    • 2.1 AMDAL and technical approvals in parallel

      One study covers the estate, mill, POME ponds and boiler, processed together with the effluent standards.

      discharge capped at 2.5 m³ per tonne of CPO

      According to Environment Ministry Regulation 5/2014

    • 2.2 Methane capture from the first drawing

      Design the pond cover and biogas genset together with the POME ponds.

    • 2.3 Smallholder schemes and plot registry

      Set the scheme model before the land title (HGU) is issued and build a polygon plot registry for Due Diligence Statements.

      community plantations of at least 20% of land from non-forest areas outside the HGU or released forest estate

      According to Government Regulation 26/2021

Phase 3: No fire, water table held, every plot recorded.

Clearing land by burning is prohibited, and a peat water table that drops too deep counts as damage. Plot numbers and planting dates recorded now become your EUDR registry.

What needs to be ready

    • 3.1 Zero-burn clearing

      Firebreaks, patrols and hotspot monitoring are logged as evidence for the construction phase.

    • 3.2 Canal blocks and monitoring wells

      Keep the cultivated-peat water table at 0.4 metres or shallower from day one.

      According to Government Regulation 57/2016

    • 3.3 Plot and worker registry

      Record polygons, planting dates and seed origin, along with contractors' working days and ages, from day one.

Phase 4: Your first milling year becomes the benchmark for every figure.

Water, power and emissions intensity in later years will be compared against this one. Sensors and meters installed before milling make those figures auditable instead of estimated.

What needs to be ready

    • 4.1 Online monitoring and the operating certificate

      Install online wastewater monitoring (SPARING) at the pond outlet before applying for the operating certificate (SLO).

      According to Environment and Forestry Ministry Regulation P.93/2018 as amended by P.80/2019

    • 4.2 Energy, water and emissions baseline

      The first energy audit, water balance and base-year greenhouse gas inventory become the reference for PROPER and decarbonisation plans.

    • 4.3 Entering PROPER and the supplier registry

      Prepare your first environmental monitoring report (RKL-RPL) and trial Due Diligence Statements with importers.

Phase 5: Methane, water and extraction rate decide your rating and your margin.

The difference lies in evidence of efficiency and methane capture, and the same figures also bring mill costs down.

1 of 960 palm oil companies in PROPER 2024–2025 reached Gold.

According to KLH/BPLH, 2025; Katadata, 2026

What needs to be ready

    • 5.1 From Green towards Gold

      Build evidence on LCA, energy and water efficiency, waste 3R, biodiversity and SROI for smallholder programmes.

    • 5.2 Water and power per tonne of FFB

      Close the gap with condensate recovery, variable speed drives and regular audits.

      4.01 vs 1.2 m³ of water per tonne of fresh fruit bunches, an Aceh Tamiang mill against the modern-mill reference

      According to the UNDIP Journal of Environmental Science, 2026

    • 5.3 Due diligence and listed-company reporting

      Prepare a Due Diligence Statement for every EU shipment. For listed companies, the PSPK 1 and 2 disclosure standards phase in from 2027.

      According to IAI, 2025

Phase 6: Replanting and new lines change figures you've already permitted.

Old estates are replanted, peat is rewetted and refineries add biodiesel lines for B50, in place since July 2026. Every capacity change needs an amended Environmental Approval.

According to the Ministry of Energy and Mineral Resources via Bisnis.com, 2026

What needs to be ready

    • 6.1 Zero-burn replanting

      Chip old trunks, keep HCV areas and arrange temporary income for harvesters and scheme smallholders.

    • 6.2 Amending the Environmental Approval

      File the amendment before a biodiesel line, biogas genset or estate expansion starts running.

    • 6.3 Carbon units from methane and peat

      Record methane capture and peat restoration as mitigation actions whose carbon units enter the national registry.

      According to Presidential Regulation 110/2025

The points that decide the value of your estate and mill.

Every unit carries its own obligations and its own data. Open them one by one.

Isometric illustration Palm Oil & Refinery, phase 5 (Full operation): Methane, water and extraction rate decide your rating and your margin.

Nursery, estate blocks and peat

Seedlings are raised and planted block by block, alongside HCV areas and peat for the life of the estate.

  • Emissions
  • Biodiversity
  • Water
  • Community

What you can manage

  • Keep the peat water table at 0.4 m or shallower
  • Patrols and camera traps in HCV areas
  • A polygon for every plot, ready for due diligence

0.4 m maximum cultivated-peat water-table depth

Source: GR 57/2016

Harvest, collection and FFB haulage

Nucleus, scheme and independent fruit is harvested and trucked to the mill, including fruit bought through collection points.

  • Emissions
  • Community
  • Safety
  • Energy

What you can manage

  • Separate fruit by supplier and plot
  • Register every collection point with its farmers
  • Log fleet diesel as Scope 1 emissions

Estate housing and workforce

Harvesters, maintenance crews and sprayers live with their families on the estate, many on contract or daily terms.

  • Safety
  • Community
  • Water

What you can manage

  • Log every worker's days and wages
  • Verify worker ages and provide childcare
  • Provide protective gear, clean water and sanitation

EU ban on forced-labour products applies from 14 December 2027

Source: Regulation (EU) 2024/3015

Loading ramp and steriliser

Fruit is cooked with steam, and the condensate becomes one of the mill's largest sources of effluent.

  • Energy
  • Water
  • Waste

What you can manage

  • Meter steam per tonne at each steriliser
  • Recover condensate and cut wash water
  • Check steam leaks during energy audits

4.01 vs 1.2 m³ water per tonne: Aceh Tamiang mill vs modern reference

Source: UNDIP, 2026

Press, clarification and kernel plant

Fruit is pressed, oil clarified and nuts cracked, while empty bunches and shells leave as solid residue.

  • Energy
  • Waste
  • Emissions

What you can manage

  • Track oil extraction rate per shift
  • Log kWh per tonne by station
  • Compost empty bunches instead of stockpiling

21.07 vs 17–19 kWh per tonne: Aceh Tamiang mill vs modern mills

Source: UNDIP, 2026

Biomass boiler and power house

Fibre and shell are burned for the mill's steam and power, and boiler ash leaves as solid residue.

  • Emissions
  • Energy
  • Waste
  • Safety

What you can manage

  • Test stack emissions under the technical approval
  • Recover flue-gas heat flagged by the audit
  • Reuse boiler ash only with approval

0–1 kg CO2e per tonne CPO from mill biomass fuel

Source: RSPO, 2018

POME ponds and methane capture

Effluent is treated in stages across ponds; without a cover, methane escapes and becomes the mill's largest emission source.

  • Emissions
  • Water
  • Community

What you can manage

  • Monitor pH, COD, TSS and flow online
  • Cover the ponds and turn methane into power
  • Record methane capture as a mitigation action

650 → 70 kg CO2e per tonne CPO with methane capture

Source: RSPO, 2018

Final treatment and land application

Final-pond effluent goes to the estate as liquid fertiliser, or to a river through the compliance point.

  • Water
  • Community

What you can manage

  • Keep effluent within permit limits
  • Monitor wells upstream and downstream of application land
  • Install a flow meter at the compliance point

2.5 m³ maximum effluent discharge per tonne CPO

Source: Regulation 5/2014

Refinery and biodiesel

CPO is refined into olein and stearin, and part is processed into FAME for the B50 biodiesel blend.

  • Energy
  • Waste
  • Water
  • Emissions

What you can manage

  • Prepare ISPO for refinery and biodiesel
  • Manage spent bleaching earth by its waste status
  • Calculate LCA per tonne of product for buyers

B50 supplied since 1 July 2026; 94% of fuel stations carried it by September

Source: Energy Ministry via Bisnis.com, 2026

Storage, port and export logistics

CPO and derivatives are stored and shipped, and every EU-bound shipment carries its plot-of-origin data.

  • Emissions
  • Water
  • Waste

What you can manage

  • Link every shipment to its source plots
  • Calculate transport emissions per tonne-km
  • Control spills and tank-cleaning waste

3.23 million tonnes of palm products shipped to the EU in 2025

Source: GAPKI via IDX Channel, 2026

Villages, indigenous communities and schemes

Nearby villages and scheme smallholders share roads, water and land with the estate, so their situation shapes your social licence.

  • Community
  • Water

What you can manage

  • Run a grievance channel that logs and answers complaints
  • Measure scheme programme results with SROI
  • Complete FPIC before opening new land

74 of 135 plantation land conflicts in 2025 involved palm oil

Source: KPA via GoodStats, 2026

1 / 11

Typical facility illustration; not a specific site.

One source of data for PROPER, due diligence and PSPK.

Without a single source, estate, mill and sustainability teams copy the same figures into different documents, and every copy leaves room for a mismatch at audit. Ailesh+ brings it together: energy in Energy+, emissions and methane in Carbon+, waste in Waste+, HCV in Biodiv+ and smallholder programmes in Social+. PROPER+ and ESG+ then build your reports from that same source.

Which phase are your estate and mill in?

Tell us the phase. We'll map the data and documents that need to be ready.