Turn audit recommendations into real savings.

We design efficiency projects, oversee their installation, then measure the results with a recognised protocol, so the savings hold up in front of your board.

Savings only count once they're installed.

Many audit recommendations stay in the report because no one designs, funds or measures them. We take those opportunities to the plant floor, from feasibility and engineering design to installation and measured results. Savings are calculated with a recognised protocol, so the figures hold up.

Savings that show on the bill and in the report.

  • Costs that fall in stages

    No-cost and low-cost steps, such as lowering compressor pressure or fixing steam leaks, often help fund the next ones. We sequence projects so savings arrive as early as possible.

  • Savings you can prove

    Savings are energy you didn't use, so they can't be read straight off a bill. We measure them with the International Performance Measurement and Verification Protocol (IPMVP) against a baseline adjusted for production, so your board, auditors and lenders accept the figures.

    According to EVO, IPMVP

  • Recommendation deadlines met

    For companies under mandatory energy management, audit recommendations must be implemented within a set period. We turn them into projects with a schedule, a budget and an owner.

    3 years to implement energy audit recommendations once the audit is complete.

    According to Energy and Mineral Resources Ministerial Regulation 8/2025

  • Emissions fall too

    Every kWh and litre of fuel saved cuts Scope 1 and 2 emissions directly. That reduction is scored in PROPER, Indonesia's corporate environmental rating, and needed for climate disclosure under the PSPK standards from 2027.

    According to Environment Ministerial Regulation 7/2025 and IAI, 2025

Designed, installed, then proven.

  1. Redefine

    Pick the priority projects

    We review audit recommendations, ours or another provider's, and select projects by savings, cost and operational readiness.

    You receive: a prioritised project portfolio and its energy baseline.

  2. Design

    Test feasibility and design

    We prepare technical and economic feasibility studies, compare financing options, then produce engineering designs and tender-ready specifications. For waste heat, we design Organic Rankine Cycle (ORC) systems that turn low-temperature heat into electricity.

    You receive: a business case per project and tender-ready documents.

  3. Accelerate

    Oversee installation

    We support procurement, installation and commissioning, including alongside a contractor you have already chosen.

    You receive: installed systems running to design.

  4. Accelerate

    Measure and prove

    We run measurement and verification (M&V) under IPMVP, then record before-and-after consumption in Energy+.

    You receive: an M&V report and energy performance reports for management, the energy ministry and PROPER.

Savings that stay visible after the project ends.

Savings that aren't tracked fade, for example when machine settings drift or maintenance slips. Energy+ records consumption before and after implementation, backed by meters from Data Acquisition & Measurement, so your team can see whether savings hold. The same data syncs to Carbon+ as an emissions reduction.

Energy+ dashboard

Start with the recommendations still on paper.

Send us your latest audit report. We'll show you which project is worth starting first.