Take from the ground, give back with proof.

We prepare the data the energy ministry (ESDM), PROPER and buyers ask for at every phase of your mine, smelter and captive power plant, and bring it together on Ailesh+.

Regulators, buyers and lenders now read the same data.

Mine water, topsoil, smelter energy and community grievance data get reused by every obligation. Collect them once, properly, and you cut closure costs while keeping finance within reach.

Risk

Permit holders who have not placed their reclamation guarantees have already had permits suspended, and some face revocation. In export markets, ferronickel has been covered by the EU's carbon border mechanism (CBAM) since early 2026.

Rp35 trillion in reclamation and post-mining guarantees already placed by permit holders.

According to the Energy Ministry via Bisnis.com, 2025

Opportunity

A smelter's power source sets its carbon footprint per tonne, the figure buyers and lenders now ask for. Furnace efficiency and cleaner supply bring cost and emissions down together.

≈60 vs 28.7 tCO2 per tonne of nickel, coal-captive smelters against a producer running on 30% renewables.

According to IEEFA, 2024

Priority

Set your water, biodiversity and social baselines before clearing, install meters before production, then plan reclamation you can prove. That data fills the annual work plan (RKAB), PROPER and PSPK reports at once.

  • Reclamation and closure (Energy Ministry Decree 344.K/MB.01/MEM.B/2025)

    in force since 23 Oct 2025

    New technical guidelines for land and marine reclamation; the post-mining guarantee must be fully placed two years before the production licence expires.

    According to the Energy Ministry via Meridian Hukum, 2025; IESR, 2024

  • PROPER (Environment Ministry Regulation 7/2025)

    annual cycle

    Mine land damage control is part of the compliance rating.

    According to the BPK legal database

  • EU CBAM

    definitive since 1 Jan 2026

    Ferronickel (CN 7202 60) is a covered good, so EU importers report its embedded emissions.

    According to the European Commission, 2026; CBAM Guide, 2026

Closure costs are decided at exploration.

Reclamation guarantees are calculated from plans made before production, and PROPER reads your data from the first year. Pick your phase to see what needs to be ready.

Phase 1: Pit location and power source are locked in here.

Forest boundaries, pit location and the choice of power plant are the costliest decisions in a mine's life. Baselines recorded now become the reference for reclamation and PROPER until closure.

What needs to be ready

    • 1.1 Forest area and spatial status

      Map forest functions and spatial approval (KKPR) inside the licence area (WIUP), then estimate the forest-use levy before drilling.

      According to Forestry Ministry Regulation 14/2025

    • 1.2 Nature and village baseline

      Survey flora, fauna, rivers and surrounding villages before any disturbance, and run FPIC where customary land is involved.

      According to IFC Performance Standards 6 and 7

    • 1.3 Energy and carbon scenarios

      Calculate tCO2 per tonne of product for each supply option: captive coal, the PLN grid or renewables.

Phase 2: One set of figures for permits, guarantees and lenders.

The AMDAL, technical approvals, reclamation plan and community development plan all cite the same design figures. Lenders using IFC standards read them too, so it pays to calculate them once, properly.

What needs to be ready

    • 2.1 AMDAL unit by unit

      Cover the pit, waste dump, settling ponds, smelter, power plant and jetty in one AMDAL, with pond design based on acid-forming rock tests.

      According to Government Regulation 22/2021

    • 2.2 Reclamation plan and guarantee

      File the reclamation plan as soon as the mining business licence (IUP) is issued; the first five years' guarantee is placed in full once the plan is approved.

      According to Energy Ministry Decree 344.K/MB.01/MEM.B/2025

    • 2.3 Community development master plan

      Build the mandatory community development programme (PPM) with local government and residents, using indicators that can later be measured as SROI.

      According to Energy Ministry Decree 1824 K/30/MEM/2018

Phase 3: Settling ponds first, land clearing second.

Sediment, dust and community complaints peak during construction. Topsoil stored properly today decides what reclamation costs years from now.

What needs to be ready

    • 3.1 Settling ponds before clearing

      Build ponds and perimeter drains first, then record downstream river quality from day one.

    • 3.2 Topsoil and staged clearing

      Clear land in line with the annual work plan, stockpile topsoil separately and plant cover crops on the piles.

    • 3.3 Contractors and community grievances

      Set safety, wage and housing standards for contractors from the day the contract is signed, and open a grievance channel before heavy equipment arrives.

      According to IFC Performance Standard 2

Phase 4: Your baseline year is set before commercial production.

Emissions intensity, wastewater load and energy use in later years will all be compared against this one. Meters and online monitors installed early make those figures auditable.

What needs to be ready

    • 4.1 Online monitoring and the operating certificate

      Install continuous emission monitoring (CEMS) on stacks and online wastewater monitoring (SPARING) at the mine outlet, then obtain the operating certificate (SLO) before the trial ends.

      According to Environment and Forestry Ministry Regulations 5/2021 and P.80/2019

    • 4.2 GHG baseline and energy manager

      Build the base-year Scope 1, 2 and 3 inventory, and appoint a certified energy manager if the smelter uses 4,000 TOE or more a year.

      According to Government Regulation 33/2023

    • 4.3 PROPER and reclamation reporting

      Prepare your first environmental monitoring report (RKL-RPL), evidence of land damage control and the annual reclamation report due on 31 January.

      According to Environment Ministry Regulation 7/2025 and Energy Ministry Decree 344.K/MB.01/MEM.B/2025

Phase 5: Proof of efficiency lifts your rating and lowers your costs.

Green and Gold PROPER ratings demand evidence of energy, water and waste efficiency, along with community programmes you can measure. Ferronickel buyers, lenders and investors read the same figures.

What needs to be ready

    • 5.1 From Green towards Gold

      Build evidence on LCA, energy and water efficiency, waste 3R, biodiversity and SROI for community programmes.

      According to Environment Ministry Regulation 7/2025

    • 5.2 Slag and coal ash as raw material

      Nickel slag and fly and bottom ash (FABA) from non-stoker power plants are listed as non-hazardous waste, so they can become construction materials under your environmental approval.

      According to Government Regulation 22/2021, Annex XIV

    • 5.3 Emissions per tonne for CBAM and PSPK

      Prepare embedded emissions per tonne of ferronickel for EU importers, and Scope 1, 2 and 3 disclosure for listed companies from the 2027 reporting period.

      According to the European Commission, 2026; IAI, 2025

Phase 6: The mine closes; the land keeps its value.

Recovered land can become forest, farmland or a solar plant, and the licence area can only be returned once reclamation is judged successful. The post-mining guarantee must be fully placed two years before the production licence expires.

According to the Energy Ministry via Meridian Hukum, 2025

What needs to be ready

    • 6.1 Reclamation success you can prove

      Monitor revegetation with satellite imagery and camera traps until the site's success criteria are met.

    • 6.2 Worker and village transition

      Prepare the workforce reduction schedule, reskilling and the handover of community programmes to village government or cooperatives.

      According to IFC Performance Standard 2

    • 6.3 Carbon units from revegetation

      Record revegetation and reforestation as mitigation actions whose carbon units enter the national registry.

      According to Presidential Regulation 110/2025

The points that decide your mine's cost and value.

Every unit carries its own obligations and its own data. Open them one by one.

Concession and exploration

The exploration team drills, maps reserves and marks the licence boundary, partly inside state forest.

  • Biodiversity
  • Community
  • Water

What you can manage

  • Map forest functions before drilling
  • Record baseline flora, fauna and rivers
  • Map surrounding villages and customary land

1, 4 and 7 times the levy tariff by forest disturbance class

Source: Forestry Regulation 14/2025

Pit and stockpile

Overburden is stripped, ore or coal is dug and the pit dewatered, then material is stockpiled and crushed.

  • Water
  • Emissions
  • Energy
  • Safety

What you can manage

  • Separate and encapsulate acid-forming rock
  • Log diesel per tonne moved as Scope 1
  • Watch coal pile temperature and dust

Haul road and jetty

Dump trucks carry material to stockpiles and the jetty, then barges move it along rivers residents also use.

  • Emissions
  • Community
  • Safety

What you can manage

  • Use a dedicated mine road, away from villages
  • Water the roads and monitor dust in settlements
  • Calculate truck and barge emissions per tonne-km

Coal trucks barred from South Sumatra's public roads since 1 January 2026

Source: detikSumbagsel, 2025

Settling ponds and mine water

Mine water and runoff are settled, neutralised with lime, measured and released at the compliance point.

  • Water
  • Community

What you can manage

  • Install a flow meter and online monitor at the outlet
  • Monitor the river upstream, at discharge and downstream
  • Add constructed wetlands for passive treatment

pH 6–9 at the compliance point for coal mine wastewater

Source: Regulation 5/2022

RKEF smelter

Ore is dried, calcined in a rotary kiln and smelted in an electric furnace into ferronickel or nickel pig iron.

  • Energy
  • Emissions
  • Waste
  • Safety

What you can manage

  • Recover kiln and off-gas heat
  • Measure kWh and emissions per tonne
  • Calculate ferronickel LCA for EU importers

≈60 vs 28.7 tCO2 per tonne of nickel: coal captive vs 30% renewables

Source: IEEFA, 2024

Captive power plant

A coal plant owned by the industrial park or smelter supplies power and steam to the furnaces and processing.

  • Emissions
  • Energy
  • Waste
  • Water

What you can manage

  • Run CEMS and routine stack testing
  • Assess biomass co-firing and renewable supply
  • Log coal and power per tonne of product

19.3 GW of captive coal power operating in Indonesia in 2025

Source: CREA/GEM, 2026

Waste rock, tailings and slag

Overburden, tailings, slag and workshop hazardous waste are dumped or managed within one area.

  • Waste
  • Water
  • Safety

What you can manage

  • Keep dump and tailings slopes stable
  • Reuse slag as aggregate or building material
  • Monitor leachate around the dumps

Nickel slag and power-plant ash are listed as non-hazardous waste

Source: GR 22/2021

Reclamation and revegetation

Land is reshaped, topsoil returned and replanted until it meets the reclamation success criteria.

  • Biodiversity
  • Water
  • Community

What you can manage

  • Plant local species as the reclamation plan sets
  • Monitor with satellite imagery and camera traps
  • File the annual reclamation report by 31 January

26,538 ha of mined land reclaimed nationally in 2024

Source: IMA/ESDM, 2025

Housing and smelter workforce

Thousands of employees, contractors and incoming workers live in company housing and work rotating shifts around the furnaces.

  • Safety
  • Community
  • Water
  • Waste

What you can manage

  • Log safety incidents per contractor
  • Run a separate worker grievance channel
  • Treat housing wastewater and waste

98,266 workers at IMIP in August 2026, 18% from Morowali

Source: IMIP, 2026

Surrounding villages

Villages whose land was acquired, that sit on the haul route or host incoming workers feel the effects first.

  • Community
  • Water
  • Emissions

What you can manage

  • Run the community master plan with local government
  • Log, answer and close every grievance
  • Measure programme results with SROI

46 agrarian conflicts in the mining sector during 2025

Source: KPA via GoodStats, 2026

1 / 10

Typical facility illustration; not a specific site.

One source of data for PROPER, investors and buyers.

Mine water, smelter energy, revegetation and village programme data usually sit in each department's own spreadsheets, so figures in your PROPER and investor reports may not match. Ailesh+ brings it together: smelter and power plant energy in Energy+, emissions in Carbon+, mine water and slag in Waste+, revegetation in Biodiv+ and community programmes in Social+. PROPER+ and ESG+ then build your reports from that same source.

Which phase is your mine in?

Tell us the phase. We'll map the data and documents that need to be ready.